Frequently Asked Questions
Q: Do I need to repaint or re-roof?
If your roof structure and tiles are sound but faded or mossy, painting is the most cost-effective solution. If there is widespread cracking, lifting or leaking, a re-roof may be needed. We'll give you an honest assessment.
Q: What colours are available?
We offer a full range of colours including all Resene and Dulux Weathershield colour palettes. We can colour-match existing paint or help you choose a new look.
Q: Can you paint roofs in winter?
Yes — we monitor weather conditions carefully. Painting requires a dry, frost-free period with appropriate temperatures. We schedule around Auckland's weather patterns.
Q: How much does roof painting cost in Auckland?
Roof painting in Auckland typically starts from $1,500 for a standard residential roof, depending on size, pitch, condition and material. We provide free no-obligation quotes — call 022 315 8987.
Q: How often should I have my roof cleaned in Auckland?
Auckland's humid climate means most roofs benefit from professional cleaning every 2–3 years. Roofs with significant tree coverage or north-facing aspects may need annual cleaning to prevent moss and lichen buildup.
Q: What roofing materials do you work with?
We work with all common NZ roofing materials including concrete tiles, terracotta/clay tiles, Colorsteel, corrugated iron, fibrous cement, butynol membrane and decramastic tiles.
Q: Do you offer emergency roof leak repair in Auckland?
Yes. We offer rapid-response roof leak repair across Auckland. Call 022 315 8987 for urgent roofing issues and we will arrange same-day or next-day inspection where possible.
Q: How much does re-roofing cost in Auckland by house size?
Budget by roof area, not house price. On a small home up to 100m² long-run Colorsteel typically runs $12,000–$20,000 and concrete tile $18,000–$30,000. A 100–200m² home is usually $20,000–$38,000 in Colorsteel or $30,000–$55,000 in tile. Above 200m², expect $38,000–$45,000+ and $55,000–$65,000+ respectively. Your exact figure depends on pitch, access and what the old roof hides.
Q: What is a normal price range for a roof repair in Auckland?
Most residential roof repairs land between $150 and $1,800. A single cracked tile, a re-bedded ridge or one lifted flashing sits at the bottom of that band; multiple leak points, rusted valley replacement or work needing a harness system and edge protection sits at the top. We quote the repair in writing after inspection so you can compare it against replacement cost before committing.
Q: Do you charge for a roof inspection or quote?
No. Roof inspections and quotes are free and carry no obligation across every Auckland suburb we serve. We attend, assess the roof, photograph anything that matters and issue a written itemised quote. Phone estimates are guesses — a roof cannot be priced honestly from the ground or from a photo, so we always look at the actual roof first.
Q: Why do roofers quote per square metre, and is that a fair comparison?
A per-m² rate is a planning tool, not a quote. It covers sheet or tile plus labour, but it excludes the variables that move the price most: scaffolding, roof pitch, number of penetrations, valley and flashing lengths, and disposal of the old roof. Two quotes with the same per-m² rate can differ by thousands. Always compare total fixed prices with a written scope, not rates.
Q: What should a roof replacement quote actually include?
A complete quote names the product and profile, the underlay, all flashings and ridge capping, fixings, removal and disposal of the old roof, scaffolding or fall protection, gutter and downpipe work if affected, clean-up, and both the workmanship and manufacturer warranty terms. If any of those are missing they become variations later. Ask for anything excluded to be listed explicitly.
Q: How much deposit does a roofing job need, and when is the balance due?
Roofing jobs typically take a deposit of 20–30% to secure the booking and cover material ordering — long-run steel is roll-formed to your roof, so it is bought before work starts. The balance is staged against progress and stated in your quotation before anything begins. You will never be asked for money on terms you did not see in writing first.
Q: Which factors push a roof replacement price up the most?
In order of impact: roof area, pitch (anything above about 30° needs staging), scaffolding for two storeys, the number of valleys, dormers and penetrations, the condition of purlins or battens once the old roof is off, and disposal volume. Concrete tile removal also adds weight and cartage. Access — a tight site with no truck room — is the factor homeowners underestimate most.
Q: Should I take the cheapest roofing quote?
Compare scope before price. A cheap quote usually differs in one of four places: thinner or unbranded sheet, reused flashings, no underlay upgrade, or no scaffolding allowance. Any of those saves money on day one and costs it back within a decade. Line the quotes up item by item — if a cheaper quote genuinely matches scope, warranty and product, it is a fair saving.